DrawEX — P&ID Compliance Scoring
Validates P&ID drawings against 35+ compliance checkpoints in under three minutes instead of four hours.
What was breaking
Each P&ID drawing required a manual review against 35+ compliance checkpoints — equipment labelling, line numbering, flow direction, control loops and instrument placement — costing engineers 4–5 hours per drawing and creating review backlogs across multi-disciplinary teams.
- 4–5 hours of expert effort per drawing
- 20–30% interpretation variance between reviewers
- Review cycles slowing project delivery schedules
DrawEX
Built on GEN8, DrawEX combines computer vision, document understanding and semantic rules to parse drawings, score compliance and generate a review-ready report in roughly three minutes.
- CV-based parsing of equipment, lines and annotations
- Semantic rule engine for 35+ compliance parameters
- Component-level pass / partial / fail scoring
- Critical-issue identification and prioritisation
- Branded, audit-ready report templates
How it works
- 01
Upload
P&ID drawings ingested as PDF or CAD via the DrawEX interface.
- 02
Parse
AI identifies equipment, instrumentation, process lines and annotations.
- 03
Evaluate
Extracted data is scored against 35+ predefined compliance parameters.
- 04
Score
Pass / Partial / Fail status with parameter-level notes and component references.
- 05
Report
Standardised, review-ready report delivered in ~3 minutes, 4 clicks.
- 01
Upload
P&ID drawings ingested as PDF or CAD via the DrawEX interface.
- 02
Parse
AI identifies equipment, instrumentation, process lines and annotations.
- 03
Evaluate
Extracted data is scored against 35+ predefined compliance parameters.
- 04
Score
Pass / Partial / Fail status with parameter-level notes and component references.
- 05
Report
Standardised, review-ready report delivered in ~3 minutes, 4 clicks.
Before vs. after
| Metric | Before | After | Improvement |
|---|---|---|---|
| Validation time per drawing | 4–5 hours | <3 minutes | 99% faster |
| Manual QA labour | 100% manual | <5% oversight | 95% automation |
| Interpretation variance | 20–30% rework | <2% rework | 90% reduction |
| Large project review | 2–3 weeks | 2–3 days | 90% faster |
| Scalability | Headcount-limited | 1,000+ drawings/day | Unlimited |
What changed
- ✓99% time reduction in drawing validation
- ✓Uniform compliance interpretation across evaluations
- ✓Team growth without proportional resource increase
- ✓Regulatory and GMP alignment with consistent, traceable reports
- ✓Easily extendable to new compliance frameworks
Inside the build
Could this work for your team?
We adapt these blueprints to your domain, data and governance constraints — typically delivering a working prototype in weeks.
